Type of Property Guide

Selling a Non-Standard Construction Flat

You can sell a flat in a concrete panel block or another non-standard building, but many mortgage lenders will not lend on them. Whether a buyer can get a mortgage depends on how the block was built, how tall it is and what the freeholder can show about its structure. If no lender will, you need a buyer who can pay cash.

A woman with greying hair reads a letter by the window of her council flat, one hand in her pocket, with a 1960s concrete panel tower block across the courtyard behind her

What Is a Non-Standard Construction Flat?

"Non-standard construction" is a label used by mortgage lenders and surveyors, not a legal term. Lenders treat brick or block walls under a pitched roof as the standard, and look harder at anything else. After the Second World War, councils built hundreds of thousands of homes quickly from factory-made concrete panels, poured concrete and steel frames. Many of those homes are flats, and many were later bought by their tenants under the Right to Buy.

In 2011 England had about 1.2 million homes with a concrete or steel structure, 5.3 percent of all homes, according to the English Housing Survey. Nearly half were still rented from a council or housing association, and the survey found these building types were used mainly for flats. The figure leaves out timber-framed homes, which the survey counts as traditional.

Non-standard does not mean defective. Plenty of system-built blocks are sound, and some systems are accepted by most lenders. What matters to a lender is the exact name of the building system, the condition of the whole block and whether the freeholder has evidence that the structure is sound, such as a structural engineer's report. For a flat, that last point is the difficult one: unlike the owner of a non-standard house, you cannot commission a report on the structure, or repairs to it, yourself.

Non-standard construction: concrete panel and system-built blocks, what lenders accept and how to sell your flat

This guide is general information, not legal, surveying, mortgage or tax advice. It covers England and Wales, and says where the law in Wales differs.

Written and kept up to date by the Sell Flat UK team at LDN Properties Ltd, who have bought leasehold flats since 2003. Last reviewed on 23 November 2026.

How Do You Know If Your Flat Is Non-Standard Construction?

Concrete blocks often look alike from the outside, and many have been reclad or rendered since they were built, so you cannot always tell by looking. Lenders do not work from a general description either. Nationwide's criteria say "the exact construction name is important as lending terms may differ between different types and years built". A flat built with one system can be mortgageable while a flat in a similar-looking block a street away is not.

Where to look

  • The freeholder. Ask the council's or housing association's home ownership team for the name of the building system, the date the block was built and any structural reports or appraisals. In 2017 the government told councils that records of large panel blocks are "likely to be held at a local rather than national level", so the freeholder is usually the only source.
  • Your Right to Buy offer notice. If you or a previous owner bought from the council, the offer notice had to describe any structural defect the council knew about in the flat or the building, under section 125 of the Housing Act 1985. Your solicitor's file from the purchase may hold a copy.
  • Your old survey or mortgage valuation. A survey or lender's valuation from when you bought usually names the construction type, and any conditions the lender attached.
  • The energy performance certificate. The wall description on the certificate sometimes reads "system built" or "timber frame". Treat it as a clue rather than proof, as the assessor may have assumed it.
  • Published reports. A few councils publish their structural reports on large panel blocks, for example Brighton and Hove City Council.

In the end, the buyer's lender decides. In a January 2025 decision, the Financial Ombudsman Service accepted that a lender could rely on its valuer's identification of a concrete system, even though the owner believed the block was a different one, and that lending on the flat before did not oblige the lender to lend again. If the name of the building system is in doubt, find out before you put the flat on the market, not after a buyer's valuation.

Which Types of Non-Standard Construction Cause the Most Problems?

The English Housing Survey counted the main groups in 2008. England then had about 434,000 homes with a poured concrete frame, 265,000 built from precast concrete panels or frames, 242,000 built with poured concrete walls such as Wimpey No-Fines and 124,000 with a metal frame. The 2011 survey grouped the types differently, and no breakdown by building type has been published since.

What is your block made of?

Eight common types of block, and how many mortgage lenders will lend on a flat in each

  • Brick or block walls

    The standard that lenders compare everything else with

    Most lenders

  • Concrete or steel frame with brick or block walls

    Many council and private blocks, and most modern ones

    Most lenders

  • Poured concrete: Wimpey No-Fines, Laing Easiform

    Mostly low-rise council homes from the post-war decades

    Most lenders

  • Timber frame with brick or block outer walls

    Common in blocks built since the 1960s

    Most lenders

  • Factory-built modular flats

    Newer blocks; lenders want an accreditation or warranty

    Some lenders

  • Older steel-framed council flats

    Post-war council homes clad in steel sheets or panels

    Few lenders

  • Precast reinforced concrete (PRC)

    Mostly houses and low-rise flats designed before 1960

    Few lenders

  • Large panel system (LPS)

    Mostly council tower blocks of the 1960s and 1970s

    Few lenders

Based on the lenders' published criteria, November 2026. Each lender sets its own rules, and also looks at the height of the block and how the flats are reached.

Large panel system blocks

Large panel system (LPS) blocks are built from storey-high concrete wall and floor panels, made in a factory and joined together on site. Most are council tower blocks of the 1960s and 1970s. On 16 May 1968 one corner of Ronan Point, a 22-storey LPS block in Newham, collapsed after a gas explosion in a flat on the 18th floor. The inquiry found the collapse was "inherent in its design", and the government told councils to appraise and, where necessary, strengthen large panel blocks over six storeys.

The issue returned in 2017, when Southwark Council found the towers on its Ledbury Estate were not strong enough, switched off their gas and later decided to demolish them. The government reminded councils that the 2012 BRE handbook on assessing these blocks "remains both current and relevant", asked them to review earlier strengthening and said that if a block has a gas supply, the council must be able to show the structure is strong enough for gas to be used safely. A Freedom of Information request reported by Inside Housing in March 2025 found 740 high-rise LPS blocks in England, 350 of them with gas.

Most lenders refuse LPS flats. Halifax is one of the few mainstream lenders that may lend, and only with an acceptable structural appraisal of the whole block.

Precast reinforced concrete

Precast reinforced concrete (PRC) homes were built from concrete posts and panels cast in a factory, mostly before 1960, under names such as Airey, Cornish Unit, Orlit, Reema Hollow Panel and Wates. Most were houses, but some systems were used for low-rise flats and maisonettes. In the early 1980s the concrete in many of them was found to be cracking, and in 1984 the government designated 22 PRC types as defective. That designation now sits in Part XVI of the Housing Act 1985.

Owners who had bought before the defects became known could get a grant to repair a PRC house, or ask the council to buy the home back. Grants were only ever available for houses: the Act says a building divided horizontally into flats is not a house. Those schemes have long closed, but lenders still use the word "designated" in their criteria. Halifax, NatWest, TSB and Accord all refuse PRC flats, and Accord says a PRC flat is unacceptable "regardless of a report".

Poured concrete: Wimpey No-Fines and Laing Easiform

In-situ concrete homes were built by pouring concrete into moulds on site, rather than casting panels in a factory. Wimpey No-Fines, a concrete made without sand, and Laing Easiform were widely used for low-rise council flats and houses. Most mainstream lenders now accept them, including NatWest, Skipton and Nottingham Building Society. Some buy-to-let lenders are stricter: Barclays declines Easiform for buy-to-let, and Pepper Money declines all poured concrete.

Steel-framed council flats

Some post-war council homes were built around a steel frame and clad in steel sheets or concrete panels. NatWest refuses council steel-framed flats even after they have been reclad, and Barclays says early steel frames are "not normally considered suitable security". Modern blocks with a steel or concrete frame and brick or block outer walls are a different matter: NatWest, for example, accepts them.

Concrete-framed blocks with brick walls

Many owners assume "concrete" means trouble. A block with a concrete frame and brick or block outer walls is not usually a construction problem, and most lenders treat it as acceptable. If buyers of a flat in this kind of block struggle to get a mortgage, the reason is more often the height of the block, open deck access or the proportion of flats still owned by the council. Our guide to selling a council flat covers those rules.

RAAC

Reinforced autoclaved aerated concrete (RAAC) is a lightweight, bubbly concrete made in planks. The Health and Safety Executive says it was "commonly used between the mid-1960s and the mid-1980s", mainly in roofs, and that building owners should get a competent structural engineer to assess it. In 2023 the Regulator of Social Housing said RAAC is not widespread in social housing. Mainstream lenders rely on their valuer to spot it, while some specialist lenders, such as Kensington, exclude it outright. RAAC in the roof of your block is a structural question for the freeholder, so our guide to selling a flat with structural problems also applies.

Timber frame and factory-built flats

Timber frame with brick or block outer walls is widely accepted: NatWest accepts it if built since 1965, and Nationwide since 1970. All-timber homes are refused by TSB, Nottingham Building Society and Kensington.

Factory-built modular flats are judged on their warranty and accreditation. BOPAS, the Buildoffsite Property Assurance Scheme, was set up with the mortgage industry and assesses whether a factory-built system will last at least 60 years. Halifax accepts modular homes with BOPAS approval and a warranty or another approved assurance, Skipton wants BOPAS and a 10-year warranty, and NatWest wants BOPAS and a structural warranty. The collapse of the modular builder ilke Homes in 2023 shows why lenders want the cover. Separately, since December 2018 the outside walls of a new block with a storey 18 metres or more above the ground have had to be built from non-combustible materials, with limited exceptions, and our guide to selling a flat with cladding or fire safety works outstanding covers the fire safety side.

Can You Get a Mortgage on a Non-Standard Construction Flat?

Lenders publish their rules for brokers, and they change them often. As at November 2026, the published criteria of the lenders below say:

  • Halifax: large panel system flats are unacceptable unless there is an acceptable structural appraisal of the whole block. Designated defective PRC flats are not acceptable.
  • NatWest: large panel system flats and PRC flats are unacceptable, even after repair. Wimpey and SSHA No-Fines, Laing Easiform built from 1945 and Mowlem are acceptable.
  • Nationwide: lends according to the exact name of the building system, and does not lend on former council flats in blocks of more than five storeys.
  • TSB: large panel system properties are unacceptable, and PRC flats are "unacceptable in all circumstances".
  • Skipton Building Society: does not lend on large panel system properties. Wimpey No-Fines and Laing Easiform built after 1945 are generally acceptable.
  • Nottingham Building Society: large panel system properties are unacceptable, and so are flats reached by open decks or balconies. No-Fines and Easiform are acceptable.
  • Leeds Building Society: PRC is not normally acceptable, and former council flats must be in blocks of no more than four floors with no balcony access.
  • Kensington (a specialist lender): excludes large panel system homes, PRC whether repaired or not, RAAC and poured concrete, apart from No-Fines and Easiform houses.

Specialist lenders often help buyers who have been turned down by high-street banks, but the ones we checked also refuse large panel and precast concrete flats. Buy-to-let lenders are usually stricter still. Pepper Money, for example, does not lend on any flat in a council or former council block.

Rules on the height of the block and how the flats are reached apply on top of the construction rules, which is why two flats built the same way can get different answers. A mortgage broker can check which lenders currently accept your block before you put the flat on the market.

Will a buyer's lender accept your block?

Four questions to work through, in order

  1. Do you know the exact name of the building system?

    No

    Find out before you market the flatAsk the freeholder, and check your Right to Buy notice and old survey. Otherwise the buyer's valuer will decide for you.

    Yes

  2. Is it large panel system or precast reinforced concrete?

    Yes

    Expect mainly cash buyersMost lenders refuse these flats. For a large panel block, ask whether a structural appraisal of the whole block exists: Halifax may lend with one.

    No

  3. Is the block above the lender's height limit, or are the flats reached by open decks?

    Yes

    Fewer lendersSome lenders limit former council flats to blocks of four or five storeys, and several refuse deck access.

    No

  4. Is the block's building system on the lender's accepted list?

    No

    Ask a broker which lenders accept itA broker can search criteria lender by lender before you accept an offer.

    Yes

    Most mortgage buyers can proceedSell in the usual way, and give the estate agent the name of the block's building system from the start.

A starting point, not a rule. Each lender applies its own criteria, and the buyer's valuer has the final say.

Why Is a Flat Harder to Sell Than a Non-Standard House?

Most of what is written about non-standard construction is about houses. A house owner can commission a structural survey, carry out an approved repair and sell with the paperwork a lender asks for. For PRC houses, BRE Global runs a repair scheme that has issued certificates since 2016 and keeps a register of repaired homes that lenders can check.

A leaseholder owns a lease of the flat, not the building. In most council and housing association leases, the structure, the outside walls, the roof and the foundations stay with the freeholder. A lender wants evidence about the whole block, and only the freeholder can commission it. You cannot strengthen a concrete panel block on your own, and you cannot make the council carry out an appraisal to suit your sale. The cost of any work the freeholder does usually comes back to you through the service charge.

Yours or the freeholder's?

What a typical council lease gives you, and what a lender wants evidence about

Yours

  • The inside of your flat: the plaster, floor finishes, internal doors and fittings, as set out in your lease

The freeholder's

  1. The concrete wall panels and the joints between them, which a structural appraisal examines
  2. The floors between flats, which tie the panels together
  3. The roof, where RAAC is most often found
  4. The gas supply to the block, if there is one
  5. The foundations
Every lease is different: check yours. A lender asks about all five numbered parts, and only the freeholder can provide the evidence.

Who Pays for Strengthening and Structural Repairs?

A council lease usually obliges the council to repair the structure and lets it recover a share of the cost from each leaseholder through the service charge. Before major works, the freeholder must consult leaseholders under section 20 of the Landlord and Tenant Act 1985, and any charge must be reasonable. Our guide to section 20 notices explains the consultation.

Strengthening a large panel block can be expensive. Brewster House and Malting House in Tower Hamlets are two large panel blocks built in about 1967, with 112 flats between them. The council's strengthening works cost more than £9.2 million, and the charge to each leaseholder was first estimated at about £61,000 to £82,000, later rising to about £70,000 to £95,000.

In December 2025 the Court of Appeal decided that the council could not recover any part of the cost through the service charge. The leases' general wording was not enough to cover making good a structural defect that had been there from the start, read against the Right to Buy rules that deal with structural defects expressly. The decision turned on the wording of those particular leases, so it does not mean every leaseholder in a concrete block is protected. It does mean a large strengthening bill is worth having checked by a solicitor before you pay it or sell.

What a strengthening bill means for your sale

A buyer will ask about any planned works in the management pack, and buyers generally deduct the full amount of a known bill from their offer, plus a margin for uncertainty. Who pays a bill that arrives during the sale depends on when it is demanded and on what you and the buyer agree. Our guide to selling a flat with major works planned covers the options.

Where the gas has been switched off after a structural review, as at the Ledbury Estate, the block will usually have electric cooking and heating. That is not a problem in itself, but buyers and their lenders will read it as a sign that the block is a large panel system and ask what the review found.

Does the Building Safety Act Protect You?

Many people think the Building Safety Act is only about cladding. In fact a "building safety risk" under the Act covers the spread of fire and the collapse of the building or any part of it. The protections apply to a "relevant building" in England, meaning a self-contained building with at least two homes that is 11 metres or more high, or has five or more storeys. Most concrete tower blocks qualify.

The catch is timing. A "relevant defect" must come from work completed in the 30 years before the protections started, that is between 28 June 1992 and 27 June 2022. A large panel block built in the late 1960s falls outside that window, so a defect in its original design is not covered. Work the freeholder carried out within the window, such as strengthening or a refurbishment, can count, but only if that work itself created a risk of fire spreading or of collapse. A defect left over from the original design does not become covered just because the block was strengthened later. How far the Act reaches in a case like that has not been tested in the courts, so take legal advice on your own block.

The 30-year window

Which work on a concrete block the Building Safety Act's protections can cover

  1. Late 1960sThe block is builtA defect in the original design is outside the window, so the protections do not cover it.
  2. 28 June 1992The window opensWork completed from this date onwards can count.
  3. For example, 2005Strengthening or refurbishmentA defect can count if this later work itself created a risk of fire spreading or collapse.
  4. 27 June 2022The window closesThe protections started the next day.
The 2005 work is an example. Whether a defect counts depends on the facts, so take legal advice on your own block.

What the protections are worth

Where a defect does count, a qualifying leaseholder pays nothing towards cladding, and the amount for other defects is capped at £10,000, or £15,000 in Greater London. Nothing is payable at all where the lease was worth less than £175,000, or £325,000 in Greater London, on 14 February 2022. To qualify, the lease must have been granted before 14 February 2022, and on that date the flat must have been your main home or you must have owned no more than three homes in the UK, including this one. One rule, which makes a wealthy landlord pay for everything, does not apply where the landlord is a council or housing association, so for council leaseholders the caps are the main protection. Our guide to selling a flat with cladding or fire safety works outstanding explains the certificate you need to give the freeholder when you sell.

In a block 18 metres or more high, or with seven or more storeys, the people responsible for the building must also prepare a safety case that covers the risk of structural failure, not only fire.

The law in Wales

These leaseholder protections apply in England only. Wales passed its own law, the Building Safety (Wales) Act 2026, which received Royal Assent on 27 April 2026 and covers the risk of collapse as well as fire. Its protections for leaseholders are to be brought in by regulations. The Welsh Government consulted on them in 2026, proposing caps similar to England's, but as at November 2026 the regulations had not been made. The Welsh Building Safety Fund pays for fire safety work only, not structural work.

What Happens If Your Block Is Being Regenerated or Demolished?

Some councils have decided that strengthening an old concrete block is not worth the cost and that it should be emptied and rebuilt instead. Southwark did this with the Ledbury Estate towers, Hammersmith and Fulham with Hartopp and Lannoy Points, and Haringey with two blocks on the Broadwater Farm estate. If your block is affected, the council's regeneration team and its published offer to leaseholders are the place to start.

What owners are paid in England

  • Market value. The value of your flat as if the regeneration scheme did not exist.
  • A home loss payment of 10 percent of market value, at least £8,100 and at most £81,000, for an owner who has lived in the flat as their main home for at least a year. These limits apply to owners displaced from 1 October 2023.
  • Disturbance costs, such as removals and the legal fees, survey fees and stamp duty on a replacement home, up to what they would have been on a home of the same value.
  • A basic loss payment for owners who do not live in the flat, such as landlords: 2.5 percent of market value, capped at £25,000, where the first compulsory purchase notice was given on or after 18 February 2026. Before that date it was 7.5 percent, capped at £75,000.

In Wales the home loss payment is at least £8,000 and at most £82,000, for owners displaced from 5 March 2025, and the basic loss payment remains 7.5 percent, capped at £75,000.

Councils must try to buy by agreement first, and many make an offer well before any compulsory purchase order. When Southwark offered to buy back flats in the Ledbury towers in 2017, it valued them as if the structural defects had not been found, and added 10 percent for resident owners and 7.5 percent for owners who did not live there. Offers vary from council to council, so get your own valuation from a RICS surveyor, whose reasonable fees the council usually pays.

In London, regeneration schemes that need funding from the Mayor, would demolish social homes and would build 150 or more homes must win a ballot of residents, unless there are significant safety reasons not to hold one. Once a scheme is announced, few buyers will take on a flat in the block, so selling privately is often slower than waiting for the council's offer.

How Much Is a Non-Standard Construction Flat Worth?

No official figures measure the effect of non-standard construction on value, and we would be wary of any website that quotes a single figure. What we can give is our own experience of buying these flats. As a rough guide:

Situation Likely effect on the sale price Who can usually buy
A widely accepted system, such as No-Fines or a concrete frame with brick walls Little or none beyond the usual factors for the block Most mortgage buyers
A system only a few lenders accept, with evidence such as a structural appraisal of the whole block 5 to 15 percent less, or a longer sale A few mortgage buyers, and cash buyers
A large panel system or PRC flat that no lender accepts 20 to 35 percent less than a comparable mortgageable flat Cash buyers and investors
As above, with strengthening charges pending, the gas removed or regeneration uncertain More, depending on the size of the risk Cash buyers who can assess the risk

The table shows typical patterns from our experience, not a valuation of your flat.

What else affects the value

The building system is the biggest single factor, but not the only one. The years left on the lease matter a great deal: Right to Buy leases were usually granted for 125 years, so many granted in the 1980s now have around 80 years left. Below 80 years, the cost of extending rises sharply, and our leasehold reform tracker shows where the planned changes to lease extension costs stand. The service charge, any planned works, the height of the block, the condition of the flat and the proportion of flats still rented from the council all count too. Our leasehold flat valuation guide sets out the full list.

Location is often the deciding factor. In sought-after areas where demand for flats is strong, more investors compete for the flats that mortgage buyers cannot buy, so the gap in sale price between those flats and mortgageable ones is smaller. Where demand is weaker and plenty of flats are for sale, cash buyers can choose a flat in a standard block instead, and offer less for a non-standard one.

Mortgage rates matter too. When rates are high, buyers can borrow less, so more of them look for cheaper flats. That can help if most lenders accept your block, for example one built with Wimpey No-Fines or with a concrete frame and brick walls. If only cash buyers can buy your flat, high rates usually mean lower offers, as investors want more rent for the money they spend.

What Are Your Options for Selling?

Why the usual way of selling is fragile for these flats

Most flats in England and Wales are sold by private treaty. You accept an offer through an estate agent, and the sale only becomes binding when contracts are exchanged, often months later. This way of selling has known weaknesses, and a non-standard block exposes them:

  • Buyers are not checked before an offer is accepted. You find out afterwards whether the buyer's lender accepts the block, when the lender's valuer visits.
  • The checks start after the offer. The valuation, the survey and the legal enquiries all happen once the flat is off the market.
  • Nothing is binding until exchange. Either side can walk away without penalty, so a lender's refusal weeks into the sale leaves you starting again.
  • A leasehold sale depends on other people. The freeholder's management pack, its structural reports and, in taller blocks, the building safety paperwork all have to arrive before exchange.

About one in four agreed sales failed to complete in the first three months of 2026, according to property data firm TwentyCi, and more than one in four in inner London. The government's roadmap for reform, published in June 2026, plans to require more information before a flat goes on the market and to introduce binding contracts earlier in the process, but only when parliamentary time allows. Most private treaty sales still complete, but for a flat in a block that most lenders refuse, the sale is most likely to fall through when the buyer's lender values the flat.

When is the construction checked?

The same flat on each selling route, and the step where the construction is examined

Estate agent

8 to 14 weeks after an offer, plus time on the market

  1. Marketing and viewings
  2. Offer accepted
  3. Construction checkedBuyer's mortgage valuation and survey
  4. Searches and leasehold enquiries
  5. Exchange of contracts
  6. Completion

Checked late. If the lender refuses the type of construction, the buyer drops out after weeks of work.

Traditional auction

About 4 to 8 weeks in all

  1. Construction disclosedLegal pack prepared
  2. Marketing and viewings
  3. Auction day: contracts exchanged
  4. Completion, usually 28 days later

Disclosed early. If the legal pack includes the construction details, bidders know about them before they bid, and the sale is binding when the hammer falls.

Cash buying company

Typically 3 to 6 weeks

  1. Enquiry and initial figure
  2. Construction checkedViewing of the flat and block
  3. Written offer
  4. Legal work
  5. Completion

Checked early. With no lender, the construction is priced into the written offer from the start.

Typical steps and timescales. A sale on any route can still be delayed by the freeholder's paperwork.

Selling through an estate agent

An estate agency sale suits a flat in a block that most lenders accept, such as one built with Wimpey No-Fines or a concrete frame with brick walls. It reaches the most buyers and usually achieves the highest sale price. A normal leasehold sale takes 8 to 14 weeks from accepting an offer to completion, plus the time on the market. For a flat in a block that most lenders refuse, the estate agent's buyers will mostly be cash buyers anyway.

The advantages of selling through an estate agent:

  • the widest pool of buyers, including first-time buyers with a mortgage, if lenders accept the type of construction
  • usually the best sale price for a flat in a block most lenders accept
  • an estate agent who knows the estate may already know which lenders accept the block

The drawbacks of selling through an estate agent:

  • a buyer's lender may refuse the block weeks after you accept the offer
  • a buyer can withdraw at any time before exchange
  • the estate agent's commission is due if the sale completes, and comes off your sale proceeds

If you do sell through an estate agent, give the estate agent the freeholder's reports and the exact name of the block's building system, such as Wimpey No-Fines, at the start. Before you accept an offer, ask the buyer for a mortgage agreement in principle from a lender that accepts that type of construction.

Selling at auction

A traditional auction takes about 4 to 8 weeks: 3 to 4 weeks of marketing, then usually 28 days from the fall of the hammer to completion. Choose a traditional auction, not the Modern Method of Auction; our guide to selling a flat at auction explains why.

The advantages of a traditional auction:

  • the sale is binding when the hammer falls, and the buyer pays a 10 percent deposit on the day
  • bidders are mostly cash buyers and investors, who do not need a lender to accept the block, and they compete against each other, so the flat sells to whoever bids the most on the day
  • your solicitor can put the construction details and the freeholder's reports in the legal pack, so bidders know about them before they bid

The drawbacks of a traditional auction:

  • the sale price depends on what bidders offer on the day, and is often lower than through an estate agent
  • if bidding does not reach the reserve price, the flat does not sell
  • the flat has to be priced to sell, and the reserve price needs to be below market value

Selling to a cash buying company

A cash buying company buys the flat itself, with no estate agent, no lender and no chain, typically in 3 to 6 weeks. We buy large panel system and precast concrete flats in most cases, subject to contract, and our offer reflects the construction and any issues with the block. Other cash buyers do the same.

The advantages of selling to a cash buying company:

  • no lender is involved, so the construction cannot stop the sale at a valuation
  • the construction is checked before the written offer, not weeks into the sale
  • there are no estate agent fees and no public viewings

The drawbacks of selling to a cash buying company:

  • offers are typically 15 to 30 percent below open-market value
  • the offer will allow for any planned works, charges or uncertainty about the block
  • firms vary, so check that the company is a member of The Property Ombudsman, read its reviews and confirm you will not have to sign anything to accept its offer

Our guide to selling to a cash buyer explains how offers are worked out.

Route Typical timescale Likely sale price Best when
Estate agent 8 to 14 weeks from offer to completion, plus time on the market Usually the highest, if lenders accept the block Most lenders accept the block and you have time
Traditional auction 4 to 8 weeks Depends on what bidders offer on the day Most lenders refuse the block and you want a binding sale on a set date
Cash buying company 3 to 6 weeks Typically 15 to 30 percent below open-market value Most lenders refuse the block, or a sale has already fallen through

What If the Flat Is Rented Out?

Buy-to-let lenders usually have the strictest rules on how a block is built and on council blocks, so a landlord who needs a mortgage to buy is often turned down. That leaves cash investors. They judge the flat on its rental yield, the annual rent as a percentage of the purchase price, and factor in the type of construction, the remaining lease term and the service charge.

You can either sell the flat with the tenant in place, or bring the tenancy to an end and sell with vacant possession. Selling with the tenant in place keeps the rent coming in and spares you the legal process of getting the flat back, but only investors will buy it. Ending the tenancy so you can sell the flat empty takes months under the Renters' Rights Act. For a flat that most lenders refuse, selling it empty brings few extra buyers, as any buyer will still need to pay cash. Our guide to selling a flat with a tenant explains the notice periods and the rules on selling.

Should You Wait, Rent It Out or Sell Now?

Waiting for the freeholder

If the council is part-way through appraising or strengthening the block, a satisfactory report could bring in lenders such as Halifax, which accepts large panel flats with an acceptable appraisal of the whole block. Ask the freeholder for its timetable and what the report will cover. The downside is that the work may lead to a large service charge bill, and the timetable is not yours to control.

Waiting for a regeneration offer

If demolition is likely, the council's offer may value the flat as if there were no defects, and add a home loss payment if you live there. Once a scheme is public, there is little point marketing the flat privately at a lower sale price, so it can be worth waiting.

Renting the flat out

Renting the flat out brings in an income while you wait. You will need the freeholder's permission if your lease requires it, landlord insurance and your mortgage lender's consent, and the Renters' Rights Act makes it slower to get the flat back. Our guide to renting out a leasehold flat covers the rules.

Refurbishing before you sell

A new kitchen, bathroom or redecoration will not change a lender's view of a concrete panel block, so you are unlikely to recover the cost in a higher sale price. The buyers of these flats are mostly investors, who plan their own works. Fix only what stops the flat being rented out or lived in, such as a broken boiler or a leak.

Whichever you choose, take your time, look at all the options and take professional advice before you commit.

What to Do Next

  1. Find out how the block was built. Ask the freeholder for the full name of the block's building system, the builder and the year the block was built, and check your Right to Buy offer notice and old survey.
  2. Ask for the block's reports. Request any structural appraisal, the gas arrangements, details of past strengthening and any planned works or regeneration plans.
  3. Have the lease checked. Ask a solicitor to check whether your lease lets the freeholder charge you for structural work, and what share you would pay. This matters most if large works are planned.
  4. Ask a mortgage broker. Find out which lenders, if any, currently accept your block, including its height and how the flats are reached.
  5. Gather your papers. Keep the freeholder's replies, your service charge demands, any section 20 notices and your lease together, ready for a buyer's solicitor.
  6. Tell your estate agent and solicitor at the start. Consumer protection law requires estate agents not to leave out information that buyers need, and in any case the buyer's lender will find out how the block was built when the lender's valuer inspects the flat.
  7. Compare the routes. Get a valuation from two or three estate agents, and a figure from an auction house and a cash buying company. Our guide to the ways to sell a flat compares them.

None of these steps commits you to anything. A few letters to the freeholder can save weeks later, and advice from a solicitor before you accept an offer costs far less than a sale that falls through. Our pre-listing checklist covers the rest of the preparation.

Where Can You Get Help?

These organisations can help:

  • Leasehold Advisory Service (LEASE). Free initial advice on leasehold law in England and Wales, including service charges and major works.
  • Your freeholder's home ownership team. The council or housing association department that deals with leaseholders holds the block's records and handles service charge questions.
  • The Housing Ombudsman. Deals with complaints about how a council or housing association landlord has handled repairs and services for its leaseholders, once the landlord's own complaints process is finished. It does not decide the amount of a service charge, which is a matter for the tribunal.
  • First-tier Tribunal (Property Chamber). Decides whether service charges, including for major works, are reasonable and payable, in England.
  • RICS Find a Surveyor. Chartered surveyors for valuations and building surveys.
  • The Institution of Structural Engineers. The professional body for structural engineers, who assess concrete systems and RAAC.
  • The FCA register. Check that a mortgage broker is authorised before you use one.
  • The Law Society's Find a Solicitor. Search for a solicitor who handles leasehold sales.

Sources and Further Reading

If most lenders refuse your block, or a buyer's lender has already turned it down, we buy large panel system, precast concrete and other non-standard flats for cash in most cases, subject to contract. No lender to satisfy, no public viewings, no chain.

Our offer is below open-market value and allows for the construction and any issues with the block from the start, so the sale does not depend on a buyer finding a lender that accepts the building.

How we buy unmortgageable flats

Frequently Asked Questions

Many concrete flats are mortgageable. Lenders accept most poured concrete systems, such as Wimpey No-Fines and Laing Easiform, and blocks with a concrete frame and brick or block walls. Large panel system and precast reinforced concrete flats are different: most lenders refuse them, and Halifax is one of the few that may lend on a large panel flat, with an acceptable structural appraisal of the whole block. The height of the block and how the flats are reached matter too, so ask a mortgage broker to check your block.

Wimpey No-Fines counts as non-standard construction, as the walls are concrete poured on site rather than brick or block. Most mainstream lenders accept it, including NatWest, Skipton and Nottingham Building Society, so a buyer can usually get a mortgage on a No-Fines flat if the block meets the lender's other rules. Some buy-to-let lenders are stricter about poured concrete, which matters if your buyer is a landlord.

A flat in a large panel system block can be sold, but most buyers will need to pay cash, as most mortgage lenders refuse these flats. Auctions and cash buying companies reach those buyers. Before you sell, ask the freeholder for any structural appraisal of the block: Halifax may lend where an acceptable appraisal of the whole block exists, which widens the pool of buyers.

Under consumer protection law, an estate agent must not leave out information a buyer needs to make a decision, and non-standard construction is likely to count, as it affects whether a buyer can get a mortgage. Give your estate agent the name of the block's building system from the start. The buyer's lender and surveyor will identify the construction anyway, usually weeks into the sale, and a buyer who finds out late may withdraw or lower their offer. Telling buyers at the outset saves time for everyone.

Cash buyers, investors and cash buying companies are the main buyers for flats that mortgage lenders refuse, such as large panel system and precast concrete flats. We buy these flats in most cases, subject to contract, and other cash buyers do too. The offer will allow for the construction, the lease, any planned works and the cost of reselling the flat, so expect it to be below what a comparable mortgageable flat would fetch.

Insurers usually ask how a building is constructed. For a flat, though, the freeholder normally insures the whole building, including the structure, and you pay a share through the service charge. Your own policy covers your contents and the fittings inside your flat, so tell the insurer how the block is built when you take out cover. If you rent the flat out, you need landlord insurance as well.

A PRC certificate confirms that a precast reinforced concrete home has been repaired under an approved scheme, and lenders that accept repaired PRC houses usually ask for one. BRE Global runs the current scheme. Flats are a different matter: the repair schemes were designed for houses. NatWest, TSB and Accord refuse PRC flats even after repair, and Halifax does not accept designated PRC flats.

Refurbishing a non-standard construction flat rarely makes it easier to sell, as lenders turn the block down because of its structure, not the state of the flat. A new kitchen or bathroom will not change a lender's view of a large panel or precast concrete block. The buyers of these flats are mostly investors, who plan their own works, so fix only what stops the flat being lived in or rented out, such as a leak or a broken boiler.

Non-Standard Construction Flat?

We buy leasehold flats. Initial figure in 24 to 48 hours. No public viewings.

Lines open Monday-Friday, 09:00-18:00